A look at the sites we've moved, the buildings we've taken down, and the infrastructure we've put in the ground.

Vancouver Underground Utility Services Improvement
Infrastructure

Vancouver Underground Utility Services Improvement

Multiple locations in Vancouver areas · April 2023

Comprehensive underground utility service line improvements across multiple Vancouver locations, including replacement of sanitary infrastructure and installation of new sanitary, storm, and watermain services.

High-Rise Ventilation Shaft Excavation
Commercial

High-Rise Ventilation Shaft Excavation

Brentwood, Burnaby · March 2023

Ventilation shaft excavation for a condominium development in Burnaby, including 20,000 ft² (~1,858 m²) of slab preparation, mechanical trenching for below-grade utilities, and rock breaking.

UBC Bulk Excavation Soil Removal
Commercial

UBC Bulk Excavation Soil Removal

UBC Campus, North Vancouver · July 2023

Removal of a 3,500 m³ soil stockpile from Nurseries Road at UBC Campus — completed within budget and 30% ahead of schedule.

River District Development
Commercial

River District Development

River District area in Burnaby · June 2022

Excavation and preparation of a 45,000 ft² (4,180 m²) slab for the River District condominium development with Wesgroup Properties.

Town Home Development – Underground Utility Systems
Residential

Town Home Development – Underground Utility Systems

Chilliwack, BC · June 2022

Excavation for sanitary tie-in and storm retention tank installation on a townhome site in Chilliwack.